Parallel Testing

The eloZ1 test system provides the ability to combine several controllers in one system. Test steps can be spread on the controllers to be executed simultaneously. That way the total test time could be reduced dramatically.

The number of controllers can be customized to the UUT and the required performance of the test cell. Using a second controller might already halve the total test time. Using more controllers will further reduce the total test time accordingly.